Coverage

37 counties across 10 states. The number on its own would overstate what most of them can answer, so the depth is stated first.

8
Interconnection depth

Parcels, zoning and national constraints, plus published circuit-level utility evidence — hosting capacity, substation capacity, distribution geometry.

29
Screening depth

Parcels, zoning and national constraints. For most of the footprint this is the honest ceiling rather than a lesser version of the above — no utility publishes circuit-level capacity there, so there is nothing further to load.

This roster is not a static list

37 counties screened · most recent 15 days ago. Counties are re-imported as their assessors and utilities republish, and every county below is re-screened from the new data rather than carried forward — so a parcel that stopped qualifying stops qualifying here.

AZ2 counties

  • Cochise, AZ

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Pinal, AZ

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth

CA8 counties

  • Colusa

    Not assessed here: Fiber routes, Water mains.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,water — until this county is rebuilt.

    Interconnection depth
  • Fresno

    Not assessed here: Fiber routes, Water mains.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+unassessed:fiber,water — until this county is rebuilt.

    Interconnection depth
  • Kern

    Not assessed here: Water mains.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:water — until this county is rebuilt.

    Interconnection depth
  • Kings

    Not assessed here: Fiber routes, Water mains.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,water — until this county is rebuilt.

    Interconnection depth
  • Merced

    Not assessed here: Fiber routes, Water mains.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,water — until this county is rebuilt.

    Interconnection depth
  • Tulare

    Not assessed here: Fiber routes, Water mains.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+unassessed:fiber,water — until this county is rebuilt.

    Interconnection depth
  • Yolo

    Not assessed here: Fiber routes, Water mains.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+unassessed:fiber,water — until this county is rebuilt.

    Interconnection depth
  • Yuba

    Not assessed here: Fiber routes, Water mains.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,water — until this county is rebuilt.

    Interconnection depth

CO1 county

  • Pueblo, CO

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth

DE1 county

  • Kent, DE

    Not assessed here: Fiber routes, Gas pipelines, Highway corridor and others.

    Screens unavailable here: EV fast charging, Utility-scale solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth

GA2 counties

  • Douglas, GA

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar, Utility-scale solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Effingham, GA

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth

IN1 county

  • St. Joseph, IN

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth

NM4 counties

  • Doña Ana, NM

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Eddy, NM

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Luna, NM

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Torrance, NM

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth

NY1 county

  • Ontario, NY

    Not assessed here: Fiber routes, Gas pipelines, Highway corridor and others.

    Screens unavailable here: EV fast charging.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth

TX15 counties

  • Andrews, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Crane, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Crockett, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Ector, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Glasscock, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Irion, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Loving, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Martin, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Midland, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Pecos, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Reagan, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Sterling, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Taylor, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Upton, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth
  • Ward, TX

    Not assessed here: Distribution-circuit geometry, Fiber routes, Gas pipelines and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost+unassessed:fiber,gas,water — until this county is rebuilt.

    Screening depth

UT2 counties

  • Beaver, UT

    Not assessed here: Distribution-circuit geometry, Highway corridor, Circuit hosting capacity and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost — until this county is rebuilt.

    Screening depth
  • Millard, UT

    Not assessed here: Distribution-circuit geometry, Highway corridor, Circuit hosting capacity and others.

    Screens unavailable here: EV fast charging, Small distribution solar, Large distribution solar.

    Ranked by an earlier rulebook — scored 3.1.0, screened 1.10.0+countywide-no-landcost — until this county is rebuilt.

    Screening depth

Not seeing your market?

Coverage is added county by county, and which counties come next is driven by what people ask for. Tell us the county and the project type and we will tell you honestly whether the data exists to support it — for some markets it does not, and we would rather say so than add a county that answers nothing.

Depth is derived from the evidence actually loaded per county, not from a maintained list. Scoring version 3.1.0, screening rules version 1.10.0. A county showing an older figure for either is live but ranked and screened by an earlier rulebook until it is rebuilt. 37 counties are on an earlier rulebook right now.